MFD Reg. PRM-5EE437/2023

HACCP

ISO 22000:2018

Karachi, Pakistan · Mon–Sat 9:00–18:00 PKT

Facility & Process

From the Arabian Sea to Your Port at −18 °C

Every claim about quality comes down to what happens on the processing floor and inside the container. Here is our process, step by step — and when you're ready, we welcome video audits and third-party pre-shipment inspection on any order.

STEP 01

Sourcing & Receiving

Fresh catch sourced through our established harbor network on the Arabian Sea coast. Every lot is inspected on arrival before acceptance.

STEP 02

Inspection & Grading

Species verification, freshness checks, and grading to standard size counts (e.g., mackerel 6/8, 8/10 pcs) under HACCP checkpoints.

STEP 03

Processing

Whole round or HGT (headed, gutted, tail-off) preparation to buyer specification by trained staff in full hygiene protocol.

STEP 04

Blast Freezing

Rapid freezing to core temperature, locking in texture and quality.

STEP 05

Packing

10 kg net weight export master cartons (alternative packing on request), labeled to buyer and destination-market requirements.

STEP 06

Cold Storage

Held at −18 °C or lower with continuous temperature monitoring until loading.

STEP 07

Container Loading & Sealing

27,000 kg per 40' high-cube reefer; pre-cooled containers, temperature set and verified at −18 °C or lower; loading photos and seal numbers shared with the buyer on every shipment.

Facility walkthrough

Take the three-minute tour.

Can't visit Karachi? Take the three-minute tour — then schedule a live video audit with our team.

Quality assurance

Logs for every lot. Available on request.

Our HACCP-based Food Safety Management System (Manual Version 02) is audited and government-verified, and the full chain is dual-certified under ISO 22000:2018. Critical control points cover receiving temperature, processing hygiene, freezing curves, cold store temperature, and container pre-cooling. Logs are maintained for every lot and available to buyers on request.

Ready to audit?

Schedule a live video audit of our facility.